orissa
- construction of hl bridge over indravati river at 3.10 km on baragaon to ghatabasuli road kosagumuda block to nagarnahar of chhatishgarh state
- Deadline : 10 Jan 2026
- Updated : 26 Dec 2025
- Value : 12.62 Crores
assam
- developement of sri sri basudev than - phase 1, dhakuakhana under lakhimpur district, assam
- Deadline : 13 Jan 2026
- Updated : 26 Dec 2025
- Value : 12.68 Crores
himachal pradesh
- formation cutting, retaining structure, w-metal beam, crash barrier, cross drainages works, metaling and tarring, interlocking concrete blocks, v-shape/u-shape drain, parapets, road signages, dumping site etc. km 27/00 to 51/660) (under nabard ridf-xxxi)
- Deadline : 02 Jan 2026
- Updated : 26 Dec 2025
- Value : 23.31 Crores
assam
- animal feed plant cattle feed and solvent extraction unit at murmela, udalguri, assam under special development project as per mos 2020 (epc mode-i)
- Deadline : 16 Jan 2026
- Updated : 26 Dec 2025
- Value : 31.26 Crores
madhya pradesh
- upgradation and widening of gurod pipaldhar road from km. 9.00 to 22.00 km. length 14.00 km. pac 2811.64 lacs second call on road and bridge s.o.r. wef 11-04-25 work period 540 days i/c rainy season
- Deadline : 09 Jan 2026
- Updated : 24 Dec 2025
- Value : 28.11 Crores
uttar pradesh
- work of two lane with paved shoulder in the remaining part of puwayan tilhar dataganj badaun road (s.h.-126) under dataganj vidhan sabha of badaun district (length-9.45 km).
- Deadline : 05 Jan 2026
- Updated : 24 Dec 2025
- Value : 23.93 Crores
madhya pradesh
- construction of bhoura sataldehi to chopna road. length 15.80 km. pac 3172.54 lacs first call on road and bridge s.o.r. wef 11-04-25 work period 540 days i/c rainy season
- Deadline : 09 Jan 2026
- Updated : 24 Dec 2025
- Value : 31.72 Crores
uttar pradesh
- widening and strengthening of mangat kheda kantha soharamau road ch. 0.00 to 18.200 in district unnao with five year maintenance
- Deadline : 30 Dec 2025
- Updated : 24 Dec 2025
- Value : 36.00 Crores
west bengal
- parihati-jamboni-fekoghat road from 0.000 kmp. to 18.000 kmp.-strengthening work in the district of jhargram under jhargram division, pwd.
- Deadline : 17 Jan 2026
- Updated : 24 Dec 2025
- Value : 36.12 Crores
madhya pradesh
- construction of four lane of sarangpur city portion old ab road nh 3 road length 7.00 km and providing pole shifting and height raising of 33 kv, 11 kv lt line and dtr shifting in sarangpur city portion road pac 3614.37 lacs second call
- Deadline : 09 Jan 2026
- Updated : 24 Dec 2025
- Value : 36.14 Crores