karnataka
- repair and sanitation work in assitant executive enginnering office in tiptur taluk
- Deadline : 02 Apr 2026
- Updated : 30 Mar 2026
- Value : See Document
karnataka
- repair and maintenance of culvert at ch 363.75 km and 401.00 km of bagalakotte biligiriranganabetta road in tarikere taluk
- Deadline : 02 Apr 2026
- Updated : 30 Mar 2026
- Value : 79.74 Crores
karnataka
- construction of cc drain on both side from malleshappa araleshwar house to malleshappa aladkatti house and nagappa honni house to hanumantappa shadgaravalli house at dashrathkoppa village in hangal taluk of haveri district. (reserved for sc category)
- Deadline : 04 Apr 2026
- Updated : 30 Mar 2026
- Value : 201.68 Crores
karnataka
- construction of foot bridge near dasabettu nandappa shetty house in havanje grama panchayath brahmavara taluk
- Deadline : 10 Apr 2026
- Updated : 30 Mar 2026
- Value : 50.12 Crores
karnataka
- supplying and engaging the road conductors (gangman) for the maintenance length of 181.10 km of major district roads in sandur taluk under 3054 (non plan) maintenance of mdrs. (06 nos gangmen)
- Deadline : 02 Apr 2026
- Updated : 30 Mar 2026
- Value : 155.67 Crores
karnataka
- connecting road via malali (sh-86), hoskote, kellur, ravandur, bettadatunga. concrete drain construction work in selected reaches (kellur village limit) in periyapatna taluk.
- Deadline : 02 Apr 2026
- Updated : 30 Mar 2026
- Value : 126.61 Crores
karnataka
- hunasuru-talakaveri road (via virajpet-napoklu- nalaknadu-bhagamandal) drain construction work in selected reaches of the road (panchavalli village limit) in periyapatna taluk, mysore dist
- Deadline : 02 Apr 2026
- Updated : 30 Mar 2026
- Value : 84.49 Crores
karnataka
- construction of c c road from sonavans home to sisten home in sc colony ward no 2 in gadag taluk of gadag district(reserved st)
- Deadline : 08 Apr 2026
- Updated : 30 Mar 2026
- Value : 40.15 Crores
karnataka
- connecting road via kittur, attigodu, bettadapura (sh-21), chikkanerale concrete drain construction work in selected reaches (haradoor gate, kittur and anandagere village limits) in periyapatna taluk.
- Deadline : 02 Apr 2026
- Updated : 30 Mar 2026
- Value : 254.22 Crores
karnataka
- connecting road via nilavagilu, ramenahalli, honnenahalli, hanagodu, panchavalli (sh-90), satyagal concrete drain construction work in selected reaches (panchavalli and satyagal village limits) in periyapatn
- Deadline : 02 Apr 2026
- Updated : 30 Mar 2026
- Value : 168.96 Crores
Subscribe / Membership
