madhya pradesh
- ujjain badnagar road remaining part of (n.h.a.i) two lane road length 8.70 k.m.with electrification work division ujjain (ii call)
- Deadline : 22 Sep 2025
- Updated : 05 Sep 2025
- Value : 9.28 Crore
west bengal
- day to day operation and maintenance of ei, sub-station, ac system and whole compound lighting etc. at the vybk, salt lake, kolkata---repair and reprograming of the existing facade lighting arrangement including allied e.i works at practice ground.
- Deadline : 12 Sep 2025
- Updated : 05 Sep 2025
- Value : See Document
punjab
- special repair / renovation of electrical installation and campus lighting in ncc academy at malout district sri muktsar sahib.
- Deadline : 18 Sep 2025
- Updated : 05 Sep 2025
- Value : 27.20 Lac
jammu & kashmir
- installation of 500 kv three phase servo stablizer for chc gandoh sitc
- Deadline : 15 Sep 2025
- Updated : 05 Sep 2025
- Value : 29.82 Lac
west bengal
- supply of non ac motor cab with engine capacity less than or equal to 2000 cc
- Deadline : 19 Sep 2025
- Updated : 05 Sep 2025
- Value : See Document
uttar pradesh
- toilet, cabin and fall ceiling work in treasury in distt muzaffarnagar
- Deadline : 10 Sep 2025
- Updated : 05 Sep 2025
- Value : 4.00 Lac
jammu & kashmir
- provisioning of split air conditioning system hot and cold in ward no. 1,2,3 and 16 and air conditioning system with heater bank in ward no.20 along with allied works at govt. smgs hospital jammu
- Deadline : 15 Sep 2025
- Updated : 05 Sep 2025
- Value : 2.19 Crore
tripura
- providing and fitting fixing of electrical accessories, spare of panel board of different water supply schemes at different locations under dws sub-division, belonia during the year 2025-26.
- Deadline : 11 Sep 2025
- Updated : 05 Sep 2025
- Value : 8.17 Lac
tripura
- operation, maintenance and upkeepment of 0.15 mgd swtp at nalua for a period of 365 days including mtc. of electric accessories, rewinding of motor, chemicals etc. under dws sub- division, belonia during the year 2025-26.
- Deadline : 11 Sep 2025
- Updated : 05 Sep 2025
- Value : 10.70 Lac
uttaranchal
- new construction of motor road from singoli-chaundi motor road to syunta amilda band in constituency devprayag of district tehri garhwal, under state sector (second phase stage-1)
- Deadline : 24 Sep 2025
- Updated : 05 Sep 2025
- Value : 85.00 Lac